In the HDR image David Figueroa and Billy Baughman are monitoring the progress that David Morse is making on the drilling of this pier. They are close to the final depth and are clearing out the debris in the hole before taking measurements to determine if they are deep enough into the bedrock.

David Morse and David Figueroa Measure Their Progress.
David Morse and David Figueroa Measure Their Progress.

Click on the image to open it in another window.

In this HDR image David Morse is measuring the depth of the drill shaft as his assistant and Oiler, David Figueroa , looks on. David is using a tape measure fitted with a weight, known as a plumb bob, that allows him to probe the bottom of the hole to attain accurate measurements. Once they are satisfied that the depth is correct they will clear the rest of the mud and rocks from the drilled shaft and turn it over to the Ironworkers who will place a caisson in the shaft in preparation for filling it with concrete.

Bothe of these images are three frame bracket sets using -2, 0 and +2 EV exposures which were merged in NIK HDR Efex Pro 2 and finished in Aperture 3.

Rigging in Black and White

Rigging
Rigging

Click on the image to open it in another window.

Today’s post is a closeup os some of the rigging that is used to move large items with the cranes. This image was originally a three exposure bracket set using -2, 0 and +2 EV exposures which I merged in NIK HDR Efex Pro 2 before taking the merged image into NIK Silver Efex Pro 2 where I used the Antique Plate preset to convert it to B&W. After making a few adjustments to exposure, contrast and film type I returned it to Aperture 3 for sharpening.

November Sunset #2

Ohio River Bridges Project at Sunset #2
Ohio River Bridges Project at Sunset #2

Click on the image to enlarge it in another window.

This HDR image was also taken from the Big Four Bridge approach ramp Wednesday evening. I was down in Waterfront Park to capture the sunset over the Walsh Construction Downtown Span section of the Ohio River Bridges Project when I saw that the few remaining clouds were picking up a gorgeous pink light. I stuck around and was lucky enough to get this image.

My processing was pretty straightforward using NIK HDR Efex Pro 2 to merge and align the bracket set and using the balanced preset to start my final processing in Aperture 3. It took a while to get the contrast and color to suit me but after a few minutes of experimenting I settled on this image.

November Sunset

Ohio River Bridges Project at Sunset
Ohio River Bridges Project at Sunset

Click on the image to enlarge it in another window.

THis HDR image was taken from the Big Four Bridge approach ramp Wednesday evening. I went down to Waterfront Park to capture the sunset over the Walsh Construction Downtown Span section of the Ohio River Bridges Project and was hoping for a dramatic sky. As the sun was setting the clouds had already drifted off to the east and I was about to call it a bust when I saw that the few remaining clouds were picking up a gorgeous pink light. I set up my tripod and spent the next few minutes shooting the river and the city skyline. When I opened the images from the shoot in my computer I saw from the thumbnails that I had captured a solid composition that I liked in this bracket set. I like the way the small amount of handrail in the foreground adds depth to this image and the way the light from the street lamps is illuminating the trees along the walkway.

My processing was pretty straightforward using NIK HDR Efex Pro 2 to merge and align the bracket set and using the balanced preset to start my final processing in Aperture 3. It took a while to get the contrast and color to suit me but after a few minutes of experimenting I settled on this image.

Going Up!

The First Tower of the Downtown Span Rises Above the River
The First Tower of the Downtown Span Rises Above the River

Click on the image to enlarge it in another window.

This HDR image shows the base of the first tower being stripped of the concrete forms that were placed there last month. The concrete base is approximately 20 feet wide and 60 feet long and will serve as the base for one of the six towers that will be built to carry the bridge deck across the river. While the Carpenters are removing the orange forms from the base the Ironworkers are busy above them erecting the reinforcement rebar for the next part of the concrete tower to be poured.

I used a three frame bracket set of +2, 0 and -2 EV exposures that were merged in NIK HDR Efex Pro 2 with 100% anti-ghosting applied to stop the movement of the workers. After merging the three exposures I returned the image to Aperture 3 for sharpening and color adjustments.