Tag: louisville kentucky

Climbing Up Inside The Tower Crane on Pier Four of The Ohio River Bridges Project

Looking into Indiana from inside the tower of the Tower Crane on Pier 4.
Looking into Indiana from inside the tower of the Tower Crane on Pier Four.

Click on the image to enlarge it in a separate window.

Last week I was cleared by the safety manager to enter and climb the tower crane that has been installed on pier four of the Ohio River Bridges Project. The tower crane is approximately 100 feet tall now and will eventually be extended up to around 200 feet in order to build the bridge towers for the northern tower of the downtown span. Each section of the crane tower is ten feet tall and affords me a place to stand and shoot from as I climb up. I only went up six sections but with the additional height of the tower base I was able to shoot from around eighty feet above the river. The view of the project from there is amazing and I can’t wait to climb higher the next time I’m out there. Eventually I will be able to climb all the way up to the crane itself and see the project as the crane operator sees it.

A view of the eastern tower structure of the Bridge Tower at Pier 4 on the Ohio River Bridges Project Downtown Span.
A view of the eastern tower structure of the Bridge Tower at Pier Four on the Ohio River Bridges Project Downtown Span.

Click on the image to enlarge it in a separate window.

In this second image you can see the base of the eastern leg of the northern bridge tower and the shadow of the tower crane. I think I was around forty feet above the base but I’m not sure exactly which level I was on when I shot this image. The river was pretty muddy from the heavy rains that went through upstream from Louisville a few days earlier. The brown shapes on the water are driftwood branches and logs that are swept into the river whenever the river rises.

Not much more to say about these images except that they are both HDR shot handheld in a three frame bracket set of +2, 0 and -2 EV exposures. They were merged in NIK HDR Efex Pro 2 and finished in Aperture 3.

Fall 2013 Commemorative Print Released (Revised)

The Ohio River Bridges Project, Commemorative Print, Fall 2013
The Ohio River Bridges Project, Commemorative Print, Fall 2013

Click on the image to enlarge it in a new window.

On May 1, 2013 I released the first commemorative print from my Ohio River Bridges Project series. I chose to start the series of commemorative prints with this particular image because I wanted to pay homage to the men and women, both past and present, who build America. By taking an image from The Ohio Bridges Project currently being built by the Walsh Construction Company, and using an antique style to process it, I hoped to connect the past and present in a single image.

The subject matter in this image is a steel caisson that was used in the foundation phase of The Ohio River Bridges Project, Downtown Crossing, in Louisville, Kentucky. The work on the bridge’s foundation is moving along nicely and there are only a few more of these caissons to be installed as the foundation rises from the river. I liked the way the barge number, the life preserver and the caisson itself emphasized a circular element while the cranes, cables and bridge above the barge relied on triangles for continuity. The figures in the image allow us to see the scale of the caisson while also referencing the labor it takes to build it.

The size is 12″ x 12″ and it is printed on .040 thick aluminum with a mounting block attached to the back. The print arrives ready to hang.  The price for the 12″ x 12″ version is ($99.99) with two additional sizes of 18 ” x 18″ ($229.99) and 24″ x 24″($399.99) also available. All prints are hand engraved with my signature in the aluminum  on the reverse side and are ready to hang. I am limiting the First Edition of 12″ x 12″ prints to 150 prints. Each First Edition print will be numbered in sequence. First Edition 18″ x 18″ prints are limited to 50 prints and 24″ X 24″ prints are limited to 10 Prints. In addition to the numbered series prints I am offering one and only one, 48″ x 48″ First Edition print for ($1799.99). After these quantities are filled the print will be retired and no further prints will be made.

I handle all printing and shipping myself to assure that the highest standards are maintained throughout the process. The printer I use is located here in Louisville and holds to the highest standards of their trade which is why I use them. I am also a proponent of buying local which makes choosing them a good fit for me. There is also a 30 day refund policy if you are not satisfied with the actual product. Upon satisfactory return I will issue a refund for the cost of the print. Return shipping will not be refunded; only the price of the print itself is covered by this guarantee.

To order your copy please use the contact form below.

[contact-form][contact-field label=’Name’ type=’name’ required=’1’/][contact-field label=’Email’ type=’email’ required=’1’/][contact-field label=’Website’ type=’url’/][contact-field label=’Comment’ type=’textarea’ required=’1’/][/contact-form]

HDR Image of 127 Feet Tall Caisson

This caisson is 127 feet tall and weighs over 170,000 pounds.
This caisson is 127 feet tall and weighs over 170,000 pounds.

Click on the image to enlarge it in another window.

Last Wednesday the Ironworkers placed a 12 foot diameter, 127 foot tall caisson in the pier near the Kentucky shore. It weighed over 170,000 pounds and was going in one of the deepest piers of the project. Watching them lift it from a horizontal position into a vertical position was amazing. It took two cranes to do it and the coordination required was incredible.

This HDR image is from a three frame handheld bracket set consisting of +2, 0 and -2 EV exposures. I took the three frames into NIK HDR Efex Pro 2 where I merged them and applied the Balanced preset. While there I set the Detail slider to accentuated and the Drama slider to deep. In order to suppress some serious halos that were showing up along the vertical elements in the sky I reduced the Method strength slider until the halos were gone. I then took the merged file back into Aperture 3 for final adjustments to colors, sharpening and contrast.

 

HDR Construction Images of a Morning in November 2013

Ironworkers from Local 70 preparing rigging on a caisson for the Ohio River Bridges Project in Louisville KY
Ironworkers from Local 70 preparing rigging on a caisson for the Ohio River Bridges Project in Louisville KY

Click on the image to enlarge it in another window.

Today’s post is rather long on images yet short on words. I decided that what I wanted to show my readers was a series of several HDR construction images from a morning in November 2013. I thought sharing these HDR images from a single morning shoot would help my readers see how busy things are on the Ohio River Bridges Project.

I am always amazed at the skill and expertise that is required to do the work of Heavy Highway and Bridge Construction. Ironworkers, Carpenters and Operating Engineers must choreograph so many moves into placing the pieces of a single pier. The skill and commitment  to safety that they use to get the massive components in place is a sign of their professionalism and dedication to their respective trades. Any miscalculation when handling these pieces could result in slowing or stopping construction or even worse the very real possibility of the loss of someone’s life. For that reason the attention paid to properly performing each element in the process is paramount to safely accomplishing the task at hand.

Ironworker Local 70 member Travis tying rebar on a caisson. #2
Ironworker Local 70 member Travis attaching rigging to a caisson. #2

Click on the image to enlarge it in another window.

Ironworker Local 70 member Travis tying rebar on a caisson.
Ironworkers Local 70 member Travis attaching rigging to the caisson.

Click on the image to enlarge it in another window.

Crane booms in the sky
Crane booms in the sky.

Click on the image to enlarge it in another window.

Ironworkers Sean and Travis rigging the caisson for the pick and placement in the pier casing. #2
Ironworkers Sean and Travis rigging the caisson for the pick and placement in the pier casing. #2

Click on the image to enlarge it in another window.

Ironworkers Sean and Travis rigging the caisson for the pick and placement in the pier casing.
Ironworkers Sean and Travis rigging the caisson for the pick and placement in the pier casing.

Click on the image to enlarge it in another window.

Starting the pick of the caisson as Travis and Sean stand by.
Starting the pick of the caisson as Travis stands by and Sean communicates with the crane operator through hand signs.

Click on the image to enlarge it in another window.

Early morning on the Indiana Approach
Early morning on the Indiana Approach.

Click on the image to enlarge it in another window.

Apprentice Carpenter Escarlett learning how to use a cutting torch.
Apprentice Carpenter, Escarlett, learning how to use a cutting torch.

Click on the image to enlarge it in another window.

Placing a Caisson in the pier casing
Placing a Caisson in the pier casing on the Indiana approach of the downtown span.

Click on the image to enlarge it in another window.

Placing a Caisson in the pier casing on the Indiana approach of the downtown span. #2
Placing a Caisson in the pier casing on the Indiana approach of the downtown span. #2

Click on the image to enlarge it in another window.

Rigging the caisson for picking.
Sean and Travis rigging the caisson for picking.

Click on the image to enlarge it in another window.

Sean and Travis rigging the caisson for picking. #2
Sean and Travis rigging the caisson for picking. #2

Click on the image to enlarge it in another window.

I hope these HDR construction images help reveal the size and scope of the Ohio River Bridges Project as well as the my admiration for the skilled tradesmen and tradeswomen who perform these critical tasks. I also hope that the next time you see a construction site or meet a construction worker you will see their contribution to our way of life and the valuable part they play in building the world. Maybe you’ll even have a little more understanding of the important role that organized labor plays in providing skilled professionals that construct safe and dependable infrastructure for our world.

One final note about these images. All of the images in this post were created from three exposure bracket sets of +2, 0 and -2 EV exposures. They were merged in NIK HDR Efex Pro 2 and finished in Aperture 3. I use NIK HDR Efex Pro 2 because it does the best job I have found of reducing, and in most cases eliminating, ghosting when working with active subjects such as the men and women in these images. I finish the merged images in Aperture 3 because it allows me to control all the other variables such as color, contrast, sharpening etc in a non-destructive workflow.

View from the North Tower of the Downtown Span of the Ohio River Bridges Project

View from the north tower of the downtown span
Looking out on the job site from the north tower of the Ohio River Bridges Project.

Click on the image to enlarge it in a separate window.

Howdy everyone. It’s been weeks since I last posted about my ongoing project to chronicle the progress of the Ohio River Bridges Project here in Louisville. I’ve been quite busy with several other aspects of my personal project of photographing the bridge building process and the men and women who are building it. When I began this project I had no idea how truly monumental and time consuming it would be.

The last bridge/construction project I worked on was much smaller and didn’t fully prepare me for the scope of a major civil engineering project such as the Ohio River Bridges Project. When I photographed the Big Four Pedestrian Bridge and the men who did it I was working with a crew that numbered less than thirty people. In contrast the Ohio River Bridges Project involves not only the main span across the Ohio River but also a complete realignment and reconstruction of the area known as Spaghetti Junction. A project of this magnitude requires hundreds of people to accomplish and really expands my personal involvement. In Spaghetti Junction there are over fifty bridges and overpasses that will be needed to connect the new bridge to the Interstates that converge in Louisville. While the downtown span will carry northbound I-65 it must also join I-64 and I-71in Spaghetti Junction.

I have had to learn how to pace myself and how to best record the progress being made. In addition to the photography challenges I face there is the need to catalog, process and organize the thousands of photographs that I have already taken. Over this past winter I discovered that I needed to greatly expand my storage equipment to accommodate the massive amount of images I am recording. I had to upgrade several hard drives and take control of the photos or face utter chaos as the project grew. I thrive on challenges and this project has been the largest challenge I have faced as a professional photographer.

I lost the first two months of 2014 to personal health issues that prevented me from getting out to the job site as much as I wanted. I also had to contend with the extreme weather that gripped Louisville and slowed the construction. That is all past me now and I’m back to shooting regularly. I have upgraded my storage media and improved my workflow to allow me to capture the images I need to tell the story.

This week I was able to get out on the river and survey the progress that has been made getting the piers drilled and in place. The northern tower is progressing well and the tower crane is being assembled on it. The two towers that make up the northern tower are already taking shape and it was possible for me to climb up the western one and get the image that begins this post. In the weeks to come I will be climbing higher on these towers to shoot the Ironworkers and Carpenters as they build them.