Last week the Ohio River Bridges Downtown Span grew another 180 feet in length. The cable stays on Tower Five were completed and the scaffolding to the top of the towers was removed. One of the cranes being used to build the bridge structure blew an engine but that didn’t keep the structural gang from completing the building of another 45 feet of bridge.
The photos in this post are both three frame HDR mergers and single frame images. In all cases the image was first adjusted for sharpness and color saturation in Adobe Camera Raw followed by a trip into Photoshop CS5 for lens correction when needed. I also used Topaz Clarity to bring out the texture and contrast which I applied to a separate layer; in several cases the opacity of the Topaz Clarity layer was reduced to between 25 -75%.