Tag: Aperture 3

Night Time Concrete Pour of the Tower Base at Pier Four of the Downtown Span

This article describes the process I used to create HDR photographs of a night time concrete pour for the Ohio River Bridges Project Downtown Span Tower base.

Long Exposure, HDR Images Of The Night Time Concrete Pour For The Plinth On Pier Four

This article is about using Long Exposure and HDR techniques to emphasize movement while taking advantage of high dynamic range photography.

Exploring and Building Presets In Topaz B&W Effects and NIK Analog Pro Plugins

This post looks at using Topaz Software with various NIK Software to create your own plugin presets for HDR photography.

Around The Ohio River Bridges Project – Abstracts and Closeups

Closeup of a concrete saw used to cut rain grooves in the new roadway surface. Black and White Version #1
Closeup of a concrete saw used to cut rain grooves in the new roadway surface. Black and White Version #1

Click on the image to enlarge it in a separate window.

These image are some closeups and abstracts that I shot last month while I was down shooting the Ohio River Bridges Project. Sometimes when I’m shooting construction I need to change my perspective by looking for abstract or closeup subjects. When I saw the concrete saws lying on a trailer I was intrigued by the pattern of the diamond cutting edges and the notches in the blades. The other image is from the tire tracks of a piece of rubber tired heavy equipment in sand.

I shot them in three frame bracket sets of +2, 0 and -2 EV exposures for later HDR processing. I processed the HDR images in NIK HDR Efex Pro 2 and Aperture 3. After completing the color versions I decided to use NIK Silver Efex to convert a couple of them to Black and White.

Closeup of a concrete saw used to cut rain grooves in the new roadway surface. Black and White Version #2
Closeup of a concrete saw used to cut rain grooves in the new roadway surface. Black and White Version #2

Click on the image to enlarge it in a separate window.

Abstract of equipment tracks in sand #1
Abstract of equipment tracks in sand #1

Click on the image to enlarge it in a separate window.

Closeup of a concrete saw used to cut rain grooves in the new roadway surface.HDR Version #2
Closeup of a concrete saw used to cut rain grooves in the new roadway surface.HDR Version #2

Click on the image to enlarge it in a separate window.

Closeup of a concrete saw used to cut rain grooves in the new roadway surface.HDR Version #1
Closeup of a concrete saw used to cut rain grooves in the new roadway surface.HDR Version #1

Click on the image to enlarge it in a separate window.

I-65 Southbound Section Was Nearing Completion

Carpenters form retaining wall on Southbound I-65 near Slugger Field
Carpenters form retaining wall on Southbound I-65 near Slugger Field

Click on the image to enlarge it in a separate window.

During the last days of construction of Phase One, Section One, of the I-65 Southbound Section, on the Ohio River Bridges Project the activity was fast and furious. There were areas that needed to be paved and concrete forms that needed building in order to stay on schedule and have it open for traffic by Sunday night.

In some of the following photos of the I-65 Southbound Section you will see areas that were almost completed and had the yellow and white traffic lane lines in place. In others the people were hard at work putting the finishing touches on their work.

Everyone was working long hours on the I-65 Southbound Section as the schedule was for 24 hours a day so the crews were constantly moving. In this group of photos you can see the amount of progress that was made in a single day. I was there early in the morning to catch the first light of day and returned in early evening to capture the progress and take advantage of the sunset light in the sky and clouds.

All the images in this post are HDR images from three frame bracket sets of +2, 0 and -2 EV exposures that were then merged in NIK HDR Efex Pro 2 and finished with Aperture 3. Using HDR techniques allows me to capture the broad dynamic range that exists at these times of day and to then use the tone mapping tools to reveal details in the shadows while also capturing the vibrance in the clouds and sky.

Looking north on the new section of southbound I-65
Looking north on the new section of southbound I-65

Click on the image to enlarge it in a separate window.

Looking north on the new section of southbound I-65 near Witherspoon Street just before it was opened to traffic.
Looking north on the new section of southbound I-65 near Witherspoon Street just before it was opened to traffic.

Click on the image to enlarge it in a separate window.

Looking south on the new section of southbound I-65 near Witherspoon Street just before it was opened to traffic.
Looking south on the new section of southbound I-65 near Witherspoon Street just before it was opened to traffic.

Click on the image to enlarge it in a separate window.

Looking north on the new section of southbound I-65 #2
Looking north on the new section of southbound I-65 #2

Click on the image to enlarge it in a separate window.

Looking north on the new section of southbound I-65 #2
Looking north on the new section of southbound I-65 #2

Click on the image to enlarge it in a separate window.