JNR_2014_10_20_45326_Delivering the edge girder – Version 2 Posted on November 10, 2014November 10, 2014 by Nick Roberts The first Edge Girder for the Downtown Span of the Ohio River Bridges Project is delivered by barge to Tower Five.